That balance remains controversial, as numerous lawsuits wind their way through various courts and the commission itself is the subject of state and federal criminal investigations over its ties to utility companies, which own the plant. “It was up to MHI, as the designer and manufacturer, to decide what design features to include that would result in safe RSGs” or replacement steam generators.īillions of dollars are at stake in the plant’s failure, and so far, the lion’s share of the tab is being covered by the ratepaying public.įollowing a November 2014 vote by the California Public Utilities Commission, customers of Edison and minority owner San Diego Gas & Electric have been paying $3.3 billion of the $4.7 billion in identified closure costs, or 70 percent. “SCE was unaware of the steam generator defects until they were discovered after the tube leak in 2012,” spokeswoman Maureen Brown said in a statement. Edison places the blame with Mitsubishi Heavy Industries, the Japanese firm hired to design and build the replacement steam generators. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |